Click on the images for a better view. Then click your back or previous button.
The job begins. The photos to the right were taken in February 2001.
Building on difficult lots is made easier with DAC-ART
The view beyond
View from the road in front
Setting the back wall
Fewer trades are required to drive to remote sites to work.
Front Façade Drawing
Back Façade Drawing
These pictures were taken 28 April 2001
Front Foundation Wall
Back Foundation Wall
The walls, details, eaves, and finished surfaces are being built by a 2 man crew in place of several different crews
normally required by conventional materials and methods.