|
|
|
|
| Sum of 1 |
|
|
|
| Course # to rignt
and Item Number below |
Total |
|
|
| 0 |
|
|
|
| caps |
|
|
|
| DW_F_TB_123012p |
|
|
|
| DW_LC_TB_123012p |
|
|
|
| DW_RC_TB_123012p |
|
|
|
| FW_DE_S_121220 |
|
|
|
| FW_DE_S_121820 |
|
|
|
| FW_DE_S_123020 |
|
|
|
| FW_F_S_121220 |
|
|
|
| FW_F_S_121520 |
|
|
|
| FW_F_S_121820 |
|
|
|
| FW_F_S_123020 |
360 |
|
|
| FW_LC_S_121220 |
|
|
|
| FW_LC_S_121820 |
3 |
|
|
| FW_LC_S_123020 |
3 |
|
|
| FW_LCE_S_123020 |
|
|
|
| FW_RC_S_121220 |
|
|
|
| FW_RC_S_121820 |
3 |
|
|
| FW_RC_S_123020 |
3 |
|
|
| FW_RCE_S_123020 |
|
|
|
| FW_S_S_120520 |
|
|
|
| FW_SE_S_121220 |
|
|
|
| FW_SE_S_121520 |
|
|
|
| FW_SE_S_121820 |
69 |
|
|
| FW_SE_S_123020 |
69 |
|
|
| Long Lintel |
|
|
|
| Short Lintel |
|
|
|
| Grand Total |
510 |
Other interior walls |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Altogether
with double rows of 12" at cyclotron room including interior walls |
|
| as drawn, the
total number of components is estimated to be |
1,382 |
|
|
|
|
|
| At factory block cost
before taxes and delivery, approx. |
|
$ 69,750.00 |
plus tax and delivery and
installation |
|
|
|
|
| Building footprint 77 x
51 = 3,927 SF |
|
3,927 |
|
| The SF cost of DAC-ART
material is |
|
$ 17.76 |
per SF as guestimated price
for all DAC-ART material (at plant total) . |
| The building
shell with foundation, slab, roof, and all DAC-ART then may be $45.00/SF,
depending on what is included. |
|
|
|
|
| This would
include all the DAC-ART interior walls as drawn. Note
that the interior walls and doubling the walls for |
| the cyclotron
room has almost doubled the amount of DAC-ART in the exterior walls alone. |
|
|
|
|
| The above is
for all blocks to be 12" thick, and doubled at cyclotron room. |
|
| Therefore,
this does not include the 2 foot
thick blocks and the mold making for these. |
|
|
|
|
| While there
would be an initial investment in the special blocks, it would |
|
| reduce the cost when
building several cyclotron rooms. |
|
|
|
|
|
|
|